DeLamar Gold-Silver Project
The owner, status and timeline of this project. A free account opens every field.
Source: Mining.com
The DeLamar gold-silver project in Idaho is a large US heap-leach gold project advancing at the feasibility stage. The project aims for mid-tier gold output with a 10-year mine plan producing an average of 88,000 oz. gold and 1.6 million oz. silver per year, targeting first production in 2028. The project has been redesigned to be simpler to permit, build, and run, with two smaller heap-leach pads
- Status
- Prospective
- Sector
- Mining
- Location
- Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Mining.com
ConstructChat
Ask ConstructChat about DeLamar Gold-Silver Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | feasibility stage |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The DeLamar gold-silver project in Idaho is a large US heap-leach gold project advancing at the feasibility stage. The project aims for mid-tier gold output with a 10-year mine plan producing an average of 88,000 oz. gold and 1.6 million oz. silver per year, targeting first production in 2028. The project has been redesigned to be simpler to permit, build, and run, with two smaller heap-leach pads and a two-stage ore crushing process. Total pre-production capital is pegged at $389 million. |
Original sector | Mining |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
Source
Source | Mining.com |
URL |
More Details
Record type | Project |
Article published date | 2025-12-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
