Delano SR-155 Rehab (3R)
Sector: Car parking • Location: CA, United States of America
Source: US Department of Transportation (USDOT)
The California Department of Transportation (Caltrans) proposes to rehabilitate approximately 1.3 miles of State Route 155 in the City of Delano from Fremont Street to 0.13 mile west of Browning Road. The work will be done under the 3R Program (resurfacing, restoration, and rehabilitation) of the State Highway Operation and Protection Program (SHOPP). The major scope of work for this 3R project wi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The California Department of Transportation (Caltrans) proposes to rehabilitate approximately 1.3 miles of State Route 155 in the City of Delano from Fremont Street to 0.13 mile west of Browning Road. The work will be done under the 3R Program (resurfacing, restoration, and rehabilitation) of the State Highway Operation and Protection Program (SHOPP). The major scope of work for this 3R project will include the following: • Remove and replace HMA as recommended per the materials deflection study report • Place RHMA, Type G, 0.10' thick for the entire pavement • Include all applicable standards as required by a 3R rehabilitation such as shoulder widening, cross-slope corrections, profile adjustment. • Improve existing drainage systems by replacing CSP culverts with RCP culverts at: Route 155/Fremont St, Route 155/Glenwood St and Route 155/High St. • Provide standard curb ramps to be in compliance with ADA guidance and construct missing segments of sidewalk. • Improve/upgrade existing electrical systems including Traffic Control Systems, traffic signals, loop detectors, pull boxes, and other electrical elements. • Utility lines within State right of way paralleling the central portion of the project will be relocated due to clear recovery zone requirements. • Approximately 3 acres of new right-of-way will be needed to install drainage ditches and construct a drainage basin. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
