logo

Delano SR-155 Rehab (3R)

Sector: Car parking • Location: CA, United States of America

Source: US Department of Transportation (USDOT)

Project
Closed

The California Department of Transportation (Caltrans) proposes to rehabilitate approximately 1.3 miles of State Route 155 in the City of Delano from Fremont Street to 0.13 mile west of Browning Road. The work will be done under the 3R Program (resurfacing, restoration, and rehabilitation) of the State Highway Operation and Protection Program (SHOPP). The major scope of work for this 3R project wi

Project Information FAQ

Project Information

5 Q
The project “Delano SR-155 Rehab (3R)” is an infrastructure initiative in the Car parking sector, located in CA, United States of America. Taiyo aggregates data on it from US Department of Transportation (USDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The California Department of Transportation (Caltrans) proposes to rehabilitate approximately 1.3 miles of State Route 155 in the City of Delano from Fremont Street to 0.13 mile west of Browning Road. The work will be done under the 3R Program (resurfacing, restoration, and rehabilitation) of the State Highway Operation and Protection Program (SHOPP). The major scope of work for this 3R project will include the following: • Remove and replace HMA as recommended per the materials deflection study report • Place RHMA, Type G, 0.10' thick for the entire pavement • Include all applicable standards as required by a 3R rehabilitation such as shoulder widening, cross-slope corrections, profile adjustment. • Improve existing drainage systems by replacing CSP culverts with RCP culverts at: Route 155/Fremont St, Route 155/Glenwood St and Route 155/High St. • Provide standard curb ramps to be in compliance with ADA guidance and construct missing segments of sidewalk. • Improve/upgrade existing electrical systems including Traffic Control Systems, traffic signals, loop detectors, pull boxes, and other electrical elements. • Utility lines within State right of way paralleling the central portion of the project will be relocated due to clear recovery zone requirements. • Approximately 3 acres of new right-of-way will be needed to install drainage ditches and construct a drainage basin.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data