Delfina wind park expansion
Sector: Car parking • Location: Brazil
Source: World Bank Group
The project entails the expansion of Delfina wind park with additional 29.4 MW of power capabilities. SPV is Enel Green Power Brasil Participacoes Ltda, a wholly owned subsidiary of the sponsor Enel. ?he project cost is equal to $ 40 million. The PPA period is 20 years. Once completed, the 29.4 MW expansion will be able to generate over 160 GWh per year, avoiding the annual emission of over 80,000
- Status
- Prospective
- Sector
- Car parking, Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Automotive, Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Delfina wind park expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the expansion of Delfina wind park with additional 29.4 MW of power capabilities. SPV is Enel Green Power Brasil Participacoes Ltda, a wholly owned subsidiary of the sponsor Enel. ?he project cost is equal to $ 40 million. The PPA period is 20 years. Once completed, the 29.4 MW expansion will be able to generate over 160 GWh per year, avoiding the annual emission of over 80,000 tons of CO2 into the atmosphere. Financial close took place on October 11, 2018. On 12 June 2019, the wind farm expansion was connected to the grid. https://www.enelgreenpower.com/media/news/d/2019/06/delfina-wind-farm-brazil-expansion-entered-service https://www.enel.com.br/en/media/press/d201810-enel-green-power-brasil-starts-construction-of-294-mw-expansion-of-delfina-wind-farm-in-brazil.html |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Car parking, Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Automotive, Commercial |
Article published date | 2024-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
