logo

Delhi-Dehradun Expressway

Sector: Government • Location: Delhi, Dehradun, Delhi, Uttar Pradesh, Uttarakhand, India

Source: Organiser

Project
Completed

The Delhi-Dehradun Expressway is a 210-kilometre, six-lane, access-controlled corridor built under the Bharatmala Pariyojana. It reduces travel time between Delhi and Dehradun from six to seven hours to approximately two and a half hours. The expressway passes through Uttar Pradesh and Uttarakhand, connecting three states and providing a direct spur to Haridwar, linking with the Char Dham Highway.

Project Information FAQ

Project Information

4 Q
The project “Delhi-Dehradun Expressway” is an infrastructure initiative in the Government sector, located in Delhi, Dehradun, Delhi, Uttar Pradesh, Uttarakhand, India. Taiyo aggregates data on it from Organiser.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Delhi-Dehradun Expressway is a 210-kilometre, six-lane, access-controlled corridor built under the Bharatmala Pariyojana. It reduces travel time between Delhi and Dehradun from six to seven hours to approximately two and a half hours. The expressway passes through Uttar Pradesh and Uttarakhand, connecting three states and providing a direct spur to Haridwar, linking with the Char Dham Highway. It features ecological engineering including a 12-kilometre elevated wildlife corridor through the Rajaji Tiger Reserve, sound and light barriers, road underpasses, and a tunnel near the Daat Kali temple. The expressway is equipped with an Advanced Traffic Management System and designed to handle 20,000 to 30,000 vehicles per day at an average speed of 100 km/h.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data