logo

Delhi-Noida Bridge Project

Sector: Road • Location: India

Source: World Bank Group

Project
Active

On 12 November 1997, the New Okhala Industrial Development Authority (NOIDA) awarded a 30-year concession for the construction and operation of a toll bridge across the Yamuna River to the Noida Toll Bridge Company Ltd. (NTBCL), a special purpose vehicle promoted and sponsored by Infrastructure Leasing & Finance Services (IL&FS). IL&FS originally had a 70% equity stake and NOIDA has a 30% stake.

Project Information FAQ

Project Information

4 Q
The project “Delhi-Noida Bridge Project” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On 12 November 1997, the New Okhala Industrial Development Authority (NOIDA) awarded a 30-year concession for the construction and operation of a toll bridge across the Yamuna River to the Noida Toll Bridge Company Ltd. (NTBCL), a special purpose vehicle promoted and sponsored by Infrastructure Leasing & Finance Services (IL&FS). IL&FS originally had a 70% equity stake and NOIDA has a 30% stake. The project includes the construction of an 8-lane main bridge with 552 meters in extension and a 10.3-Km expressway with 8 lanes. The contract has a build-operate-own-transfer structure, with the road reverting to NOIDA after 30 years. The contract provides for a pre-determined 20% rate of return and gives NTBCL the right to set and collect tolls. The government agreed not to permit construction of a competing facility for a period of 10 years. Repayment of the project is structured on a back ended basis. The total cost is estimated at US$94 million. In July 1998, Credit Analysis and Research Limited gave the company's proposed bond issue a BBB+ rating. IL&FS will ask the construction contractors and operator to take an equity stake in the project. Financial closure was achieved in Dec. 1998. In October 1999, Asian Infrastructure Mezzanine Capital Fund and American International Group acquired 16.34% of the project company's shares each (they invested US$ 9.2 million in fully-convertible debenture issued by the company that will be compulsorily converted into equity shares at par at the end of 36 months). The construction works were concluded in Feb. 2001. The average daily traffic flow is estimated at 800,000 vehicles (capacity: 16,000 vehicles per hour). None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data