logo
ProjectUnder Construction

Delta Forge 1 AI Campus Data Center

One of 10,000+ projects Taiyo tracks in Louisiana.

Source: 10/12 Industry Report

Applied Digital is developing an AI campus called Delta Forge 1 in Rapides Parish, Louisiana. The campus will be purpose-built for large-scale AI training and inference workloads, initially including two facilities totaling 300 megawatts of critical IT load across 300 acres. The project will create 200 direct jobs and support over 1,000 construction jobs at peak construction. The campus uses a clo

Status
Under Construction
Sector
Data Center, Commercial, Power Transmission, Power Generation (CCGT)
Location
Louisiana, United States of America
Updated
22 Jul 2026
Source
10/12 Industry Report

ConstructChat

Ask ConstructChat about Delta Forge 1 AI Campus Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Delta Forge 1 AI Campus Data Center” is an infrastructure initiative in the Data Center sector, located in Louisiana, United States. Taiyo aggregates data on it from 10/12 Industry Report.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Applied Digital is developing an AI campus called Delta Forge 1 in Rapides Parish, Louisiana. The campus will be purpose-built for large-scale AI training and inference workloads, initially including two facilities totaling 300 megawatts of critical IT load across 300 acres. The project will create 200 direct jobs and support over 1,000 construction jobs at peak construction. The campus uses a closed-loop cooling system and is powered by Cleco, the local electric utility.

Original sector

Technology

Budget

Location

Country

United States of America (USA)

State

Louisiana

Source

Source

10/12 Industry Report

URL

More Details

Record type

Project

Sector

Data Center, Commercial, Power Transmission, Power Generation (CCGT)

Article published date

2026-05-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project