Delta Junior High School Parking Lot Resurfacing
Sector: Water Supply and Storage • Location: Delta Junction, Alaska, United States of America
Source: Dodge
3.1 OpGon 1: Base DJHS Parking Lot Resurface* 3.1.1 Resurfacing: - Clean and prepare the exisGng parking lot surface, removing all material debris. - Area: Approximately 80,000 square feet, from the entrance off Nistler Road to all currently paved areas of the DJHS parking lot. - Repair cracks, potholes, or other surface damage. - Apply asphalt overlay or full resurfacing (based on site assessment
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Car parking, Road, Automotive, Commercial
- Location
- Delta Junction, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Delta Junior High School Parking Lot Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 3.1 OpGon 1: Base DJHS Parking Lot Resurface* 3.1.1 Resurfacing: - Clean and prepare the exisGng parking lot surface, removing all material debris. - Area: Approximately 80,000 square feet, from the entrance off Nistler Road to all currently paved areas of the DJHS parking lot. - Repair cracks, potholes, or other surface damage. - Apply asphalt overlay or full resurfacing (based on site assessment and recommendaGons). - Ensure proper drainage and grading for water runoff. 3.1.2 Line PainGng: ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Delta Junction |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Car parking, Road, Automotive, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
