Delta Solar

The status, timeline and source of this project. A free account opens every field.

Source: International Finance Corporation (IFC)

The project is a greenfield 50 MW photovoltaic (PV) plant being developed by Alcazar Energy Egypt Solar S.A.E (the “sponsor”) as part of Round 2 of the Egyptian Government feed-in-tariff (FiT) scheme for domestic solar PV and wind energy projects.  The sponsor will develop the Project under a Special Purpose Vehicle (SPV) of Delta for Renewable Energy SAE (Delta).  For Delta SPV, the sponsor is th

Status
Prospective
Sector
Water Supply and Storage, Solar, Waste Processing and Treatment, Warehouse, Wind, Power Transmission, Road, Power Generation (CCGT), Residential, Commercial, Government
Location
Egypt
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Delta Solar

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Delta Solar” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is a greenfield 50 MW photovoltaic (PV) plant being developed by Alcazar Energy Egypt Solar S.A.E (the “sponsor”) as part of Round 2 of the Egyptian Government feed-in-tariff (FiT) scheme for domestic solar PV and wind energy projects.  The sponsor will develop the Project under a Special Purpose Vehicle (SPV) of Delta for Renewable Energy SAE (Delta).  For Delta SPV, the sponsor is the majority shareholder (75%) while the Nile Capital S.A.E. is minority shareholder (25%) in the SPV. The Engineering, Procurement, and Construction (EPC) Contractor will be an EPC joint venture (EPC JV) between TSK and Enviromena, who will also undertake the role of the Operations and Maintenance (O&M) Contractor for this project.  Environmena were established in Abu Dhabi in 2007, as the first downstream solar company in the Middle East and North Africa.  TSK was established as a public company in 1986 and began working in the solar PV field in 2006.  It has participated in projects with a capacity of 400MW in PV.  The total project cost is up to US$ 70-75 million with an IFC A loan of up to US$ 14 - US$15 million and syndications of up to US$ 42.3 million, and the balance covered by equity. The project will be located within Egypt’s New and Renewable Energy Agency (NREA)’s 37.5 km 2   Benban 1.8 GW PV solar park comprising 39 separate PV plots, situated 12 km east of the nearest village (Benban), and 15 km west of the Nile River.  It is close to the Luxor-Aswan road, 40 km northwest of Aswan city, in the Aswan Governorate of Upper Egypt.  The project capacity is approximately 64.03 MWp (DC) for a 50 MW inverter nominal power (AC) and occupies a 0.98 km 2   plot (SBN 19-3) in the central part of the Benban PV solar park.    The Benban PV solar park is being constructed on open desert land that is owned by NREA.  All of the 39 PV development sites are greenfield, and none have begun full construction.  One project has started preliminary works and constructed some basic facilities on the site including office, dispensary, workers resting area, and installed underground septic tanks, none of which are yet operational.  The area is mainly flat, with sand and gravel dunes, and with no notable natural vegetation and no human activities.   The project will be linked to substation 3 (SS3) on the eastern side of the Benban PV solar park, via an underground 22 kV transmission line installed by EETC. Substation 3 covers an area of 15,000 m2. To evacuate the energy produced by the 39 projects located at the solar park, in addition to the underground connections and substations, the EETC will also be responsible for designing and building 220 kV overhead transmission lines that will connect the solar park to existing transmission corridors. At a later stage, an additional 180 km double circuit 500 kV transmission line will be constructed by EETC north of the site. EETC will be responsible for the procurement and development of the corresponding environmental and social assessments (ESIAs) for all the elements listed above. All output generated by the project will be sold to EETC under a 25-year Power Purchase Agreement (PPA).The project’s underground transmission line right-of-way will follow the route of the internal Benban PV solar park roads.  The water necessary for the solar plants (predominantly to be used during construction and for PV panel cleaning during operations) is expected to be sourced from wells around the site.  NREA is taking responsibility for commissioning the relevant studies of groundwater in the area and are liaising directly with the Ministry of Water Resources and Irrigation.  Subject to the results of these studies, additional infrastructure may be required for the extraction and distribution of water within the Benban PV solar park.  A Facility Manager Contractor (FMC) will lead and coordinate the water supply in collaboration with the developers on the site.  As mentioned in the section on PS1 below, a FMC will be hired to undertake or direct the management of cross cutting construction and operation activities for all the Benban solar park on behalf of the solar developers.  This approach will assist in ensuring that environment, social and health and safety (ESHS) risks are managed consistently and there is a well-managed and coordinated response to overarching cumulative issues such as occupational health and safety, transport /traffic management, security, community engagement and corporate social responsibility, and labor, worker welfare and accommodation, among others.The project will comprise a single axis tracking system of approximately 194,040 PV panels (polycrystalline silicon modules) with a nominal capacity of 50 MW AC and a peak capacity of 64.03 MWp DC. Power will be sent to an inverter and fed into the utility power grid system through EETC substation 2.  The Transmission Connection Agreement (TCA) formed part of the original cost sharing agreement signed on the 30th November 2015.  It is estimated that the project construction period (currently expected to start in October 2017) will last approximately 12 months with the project designed for a 25 plus year operational lifetime, with options to extend the lease after that date.  The FMC will be responsible for managing water and wastewater services, waste management services, logistics and security services, stakeholder engagement and worker accommodation among other, all of which will be developed by October 2017 once the FMC is appointed.  The project is expected to employ an average of 250 workers during construction (reaching a peak of 500) and is expected to employ 15-20 personnel during the operational phase of the project.

Original sector

V-BF - Solar - Renewable Energy Generation

Location

Country

Egypt

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Solar, Waste Processing and Treatment, Warehouse, Wind, Power Transmission, Road, Power Generation (CCGT), Residential, Commercial, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project