DEME Group Offshore Construction Vessel
Planned · Last reported Sep 2025
Source: Market.us
In September 2025, DEME Group decided to build an additional Offshore Construction Vessel (OCV) using hybrid battery propulsion technology and methanol readiness capability to increase subsea cable installation capacity for offshore wind projects.
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Wind
- Updated
- 22 Jul 2026
- Source
- Market.us
ConstructChat
Ask ConstructChat about DEME Group Offshore Construction Vessel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In September 2025, DEME Group decided to build an additional Offshore Construction Vessel (OCV) using hybrid battery propulsion technology and methanol readiness capability to increase subsea cable installation capacity for offshore wind projects. |
Original sector | Energy and Power |
Location
| Not available for this record. |
Source
Source | Market.us |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Wind |
Article published date | 2026-07-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 14 KW 35 MODULES AND 1 BATTERY 13.5 KWH ESS
- INSTALL (141) TESLA SOLAR ROOF TILES AT 10.152 KW TOTAL. INS TALL (13.5) KWH ENERGY STORAGE SYSTEM AND (N) LOAD CENTER
- 10' SUSPENDED WIRE PERIMETER SECRURITY SYSTEM INSIDE FENCE, BATTERY OPERATED LOW VOLTAGE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.32 KW 12 MODULES AND INSTALL BACK-UP BATTERY 10.5 KWH, EQUIP. ON ENGINEERED FENCE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.2 KW 12 MODULES 1 LG CHEM BATTERY 9.5 KWH
- REMOVE & REPLACE ANTENNAS, RRUS, BATTERY UNIT
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 10.8 KW 27 PANELS 1 NEW TESLA BATTERY NEW 100 AMP SOLAR PANEL
- PHASE 3-DATA CENTER- ENCOMPASSING OF PART OF 3RD FLOOR AHU ELECTRICAL ROOM,BATTERY ROOM,INSALL GENERATORS&EQUIP IN YARD
