Deming - Kmart Marshall's TI
Sector: Power Generation (CCGT) • Location: Deming, New Mexico, United States of America
Source: Dodge USA
The Alteration Level 2 / Tenant Improvement of the existing previous Kmart Building into a mercantile shop known as Marshalls (TJX) . Shall include: Approx. 24,445 sf, Alteration Level 2. This Project will consist of a complete build-out of the space, with a large sales floor, new dressing rooms, offices, restrooms, storage / processing room, phone and electric room and break room for employees, p
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial)
- Location
- Deming, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Deming - Kmart Marshall's TI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Sub Bidding, Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Alteration Level 2 / Tenant Improvement of the existing previous Kmart Building into a mercantile shop known as Marshalls (TJX) . Shall include: Approx. 24,445 sf, Alteration Level 2. This Project will consist of a complete build-out of the space, with a large sales floor, new dressing rooms, offices, restrooms, storage / processing room, phone and electric room and break room for employees, per (TJX) specifications. It will consist of a new truck dock on the north side of the building wi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Deming |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
