Democratic Republic of Congo - Batshamba-Tshikapa Road Improvement Project: Loange Bridge - Lovua Bridge Section

Sector: Residential • Location: Democratic Republic of Congo

Source: African Development Bank (AfDB)

Project

This project relates to the development of the remaining 56-km portion of the Batshamba-Tshikapa road between Lovua and Tshikapa on the NR1, including the construction of a new bridge over the Kasaï River which crosses Tshikapa town. It supplements earlier Bank interventions on the same road: (i) between Nsele-Lufimi (93+850 km) and Kwango-Kenge (70+34 km) through a UA 52.45 million grant and comp

Project Information FAQ

Project Information

4 Q
The project “Democratic Republic of Congo - Batshamba-Tshikapa Road Improvement Project: Loange Bridge - Lovua Bridge Section” is an infrastructure initiative in the Residential sector, located in Democratic Republic of Congo. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project relates to the development of the remaining 56-km portion of the Batshamba-Tshikapa road between Lovua and Tshikapa on the NR1, including the construction of a new bridge over the Kasaï River which crosses Tshikapa town. It supplements earlier Bank interventions on the same road: (i) between Nsele-Lufimi (93+850 km) and Kwango-Kenge (70+34 km) through a UA 52.45 million grant and completed in 2011; and (ii) between Loange and Lovua (63 km) financed by an ADF grant of UA 53.55 million approved in 2012. The project will help to open up Bandundu and West Kasaï Provinces, by linking them to the Capital Province of Kinshasa. In particular, the project will halt the massive exodus of youths towards mining operations, prevalent in the project area in permanently insecure conditions, and maintain them in their homelands to engage in profitable agricultural activities. The project, to be implemented from December 2013 to December 2018, comprises four components, namely: (i) road works; (ii) related works; (iii) institutional support, management and monitoring; and (iv) compensation of affected persons.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data