logo

Democratic Republic of Congo - Nyumba Ya Akiba Cement Project

Sector: Manufacturing (Industrial) • Location: Democratic Republic of Congo

Source: African Development Bank (AfDB)

Project

The present project concerns the Nyumba Ya Akiba Cement project. It consist of a cement production plant, limestone quarry, and associated facilities. The cement plant will be supplemented by limestone and clay from mining concessions located approximately 1.5 km north of the cement plant site. An access road linking the plant to the N1, and a haul road between the quarry and plant (following an e

Project Information FAQ

Project Information

4 Q
The project “Democratic Republic of Congo - Nyumba Ya Akiba Cement Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Democratic Republic of Congo. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present project concerns the Nyumba Ya Akiba Cement project. It consist of a cement production plant, limestone quarry, and associated facilities. The cement plant will be supplemented by limestone and clay from mining concessions located approximately 1.5 km north of the cement plant site. An access road linking the plant to the N1, and a haul road between the quarry and plant (following an existing track), should be constructed, as well as a power line, linking the project to the national energy grid. The total footprint area of the project is approximately 150 ha. The key components of the project include: (i) cement plant; (ii) limestone quarry; (iii) overburden storage facility; (iv) 220 KV powerline (6 km long) to an existing substation; (v) employee accommodation camps (for 300 personnel); (vi) waste management facility; (vii) access and haul roads; (viii) railway connection to the national rail network; (ix) auxiliary facilities (water management infrastructure, package sewage treatment plant, explosives store, etc.).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data