Democratic Republic of Congo - PPF of the Bukanga Lonzo Agro-Industrial Park Support Project
Sector: Raw Materials • Location: Democratic Republic of Congo
Source: African Development Bank (AfDB)
The proposed operation concerns an advance under the Project Preparation Facility (PPF), not exceeding UC eight hundred and forty-three thousand two hundred and two (843,202), granted to the Democratic Republic of Congo to finance studies relating to the preparation of the Bukanga-Lonzo Agro-Industrial Park (PAI-BL) programme. The Bukanga-Lonzo Agro-Industrial Park (PAI-BL) is the DRC government's
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed operation concerns an advance under the Project Preparation Facility (PPF), not exceeding UC eight hundred and forty-three thousand two hundred and two (843,202), granted to the Democratic Republic of Congo to finance studies relating to the preparation of the Bukanga-Lonzo Agro-Industrial Park (PAI-BL) programme. The Bukanga-Lonzo Agro-Industrial Park (PAI-BL) is the DRC government's first initiative to transform its agriculture in order to improve food security by reducing food imports, increase agricultural productivity and reduce poverty among its population. The success of the PAI-BL project depends to a large extent on the excellence of the structuring infrastructure that will be put in place (roads, energy, water) as well as on the pooling of the efforts of agricultural producers. PPF funding will be used to carry out a study covering the following areas: (i) technical studies of complementary structuring infrastructures. These include: a 50 km access road linking the PAI-BL to the main road (N1); an electricity distribution network; a water distribution network to supply the irrigation system, industries and residential areas; (ii) environmental and social impact studies; (iii) a study of the institutional arrangements, governance, viability and sustainability of the agro-industrial park, including the participation of small-scale producers. Activities will be spread over a maximum period of 12 months from the date of entry into force of the agreement. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
