Democratic Republic of Congo - Project for the Reinforcement of Socio-Economic Infrastructure in the Central Region (PRISE)
Sector: Residential • Location: Democratic Republic of Congo
Source: African Development Bank (AfDB)
The Project for the Reinforcement of Socio-economic Infrastructure in the Central Region (PRISE) covers the two Kasaï provinces which have a population of 8.2 million, that is, 12% of the country’s population. The PRISE comprises a rural component and an urban component. The rural component, based on the National Rural Drinking Water Supply and Sanitation Programme prepared with ADF financing, is
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project for the Reinforcement of Socio-economic Infrastructure in the Central Region (PRISE) covers the two Kasaï provinces which have a population of 8.2 million, that is, 12% of the country’s population. The PRISE comprises a rural component and an urban component. The rural component, based on the National Rural Drinking Water Supply and Sanitation Programme prepared with ADF financing, is a component of the 2013-2017 Five-Year Plan of the National Healthy Villages and Schools Programme (PVEA). This programme, which was launched by the Government in 2006 and coordinated by the Ministry in Charge of Health and Education, is supported by many donors. The urban component concerns: (i) the construction of the drinking water supply system of the Mbuji-Mayi town, the region’s main urban centre, in coordination with BADEA and KFW, and (ii) electrical power supply to help operate the drinking water system of Tshikapa town being constructed under the Semi-Urban Drinking Water Supply and Sanitation Project (PEASU). The estimated cost excluding tax of the project is estimated at UA 105.18 million, of which 82.17 million in foreign currency (78.12%) and 23.01 million in local currency (21.88%). The project is structured around the following components: A) infrastructure development (DWSS, schools, health centers, gender center); B) Studies and Capacity Building; and C) project coordination and management. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
