Demolition of Washington Capitol General Administration Building
One of 10,000+ projects Taiyo tracks in Washington.
Source: Yakima Herald-Republic
The project involves demolishing the long-vacant General Administration Building on the Washington state Capitol campus. The six-story, 283,865-square-foot building, completed in 1956, is being torn down due to being no longer up to code and containing hazardous materials such as asbestos and lead paint. The demolition includes preserving historic elements like a mosaic mural and a bronze seal. Th
- Status
- Failure
- Sector
- Government, Commercial, Residential
- Location
- Olympia, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Yakima Herald-Republic
ConstructChat
Ask ConstructChat about Demolition of Washington Capitol General Administration Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under demolition |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves demolishing the long-vacant General Administration Building on the Washington state Capitol campus. The six-story, 283,865-square-foot building, completed in 1956, is being torn down due to being no longer up to code and containing hazardous materials such as asbestos and lead paint. The demolition includes preserving historic elements like a mosaic mural and a bronze seal. The site will temporarily be used as a laydown area for construction materials, with permanent use to be decided by the Legislature. |
Original sector | Government |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Olympia |
Source
Source | Yakima Herald-Republic |
URL |
More Details
Record type | Project |
Sector | Government, Commercial, Residential |
Article published date | 2026-04-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Tampa Bay Seawater Desalination Plant
- Portugues Dam, Ponce
- Sinking Creek Wastewater Treatment Plant Expansion, Tennessee
- Carlsbad Desalination Project, San Diego, California
- Joint Base Lewis-McChord
- Fort Riley Army Base, Kansas
- Fort Benning, Georgia
