logo

Demonstration of 4MW Pressurized Alkaline Electrolyser for Grid Balancing Services

Sector: Hydrogen • Location: Greece, Switzerland, Spain, Austria

Source: EU Funding & Tenders Portal

Project
Ended

The main aim of project Demo4Grid is the commercial setup and demonstration of a technical solution utilizing “above state of the art” Pressurized Alkaline Electrolyser (PAE) technology for providing grid balancing services in real operational and market conditions. In order to validate existing significant differences in local market and grid requirements Demo4Grid has chosen to setup a demonstra

Project Information FAQ

Project Information

3 Q
The project “Demonstration of 4MW Pressurized Alkaline Electrolyser for Grid Balancing Services” is an infrastructure initiative in the Hydrogen sector, located in Greece, Switzerland, Spain, Austria. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The main aim of project Demo4Grid is the commercial setup and demonstration of a technical solution utilizing “above state of the art” Pressurized Alkaline Electrolyser (PAE) technology for providing grid balancing services in real operational and market conditions. In order to validate existing significant differences in local market and grid requirements Demo4Grid has chosen to setup a demonstration site in Austria to demonstrate a viable business case for the operation of a large scale electrolyser adapted to specific local conditions that will be found throughout Europe. To achieve that, Demo4Grid will demonstrate at this demo site with particular needs for hydrogen as a means of harvesting RE production: I. a technical solution to meet all core requirements for providing grid balancing services with a large scale PAE in direct cooperation with grid operators, II. a market based solution to provide value added services and revenues for the operation strategy to achieve commercial success providing grid services and those profits obtained also from the hydrogen application. III. Aiming at the exploitation of the results after the project ends, Demo4Grid will assess the replicability and viability of various business cases Demo4Grid will be the decisive demonstration stage of previous FCH-JU projects related to the PAE addressed in this proposal. The first project ELYGRID (finished) and the following one ELYntegration (still ongoing) have provided promising results on the development of PAE to provide grid services operating under dynamic profiles (significant results will be shown in this proposal).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data