logo

Demonstration of a self-erection system for wind turbine towers

Sector: Wind • Location: Spain

Source: EU Funding & Tenders Portal

Project
Ended

"One of the main wind market trends is to increase the size of wind turbines in order to take full advantage of available wind resources and thus improve the COE. However, such increase has led to a number of limitations, both technical and economic, in the installation of towers over 120 m, which result in a bottleneck that paralyses this market trend. Large cranes are used for the installation o

Project Information FAQ

Project Information

3 Q
The project “Demonstration of a self-erection system for wind turbine towers” is an infrastructure initiative in the Wind sector, located in Spain. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

"One of the main wind market trends is to increase the size of wind turbines in order to take full advantage of available wind resources and thus improve the COE. However, such increase has led to a number of limitations, both technical and economic, in the installation of towers over 120 m, which result in a bottleneck that paralyses this market trend. Large cranes are used for the installation of all types of towers, which result in significant cost overrun in the installation of towers higher than 120 m and limiting the installation of towers higher than 140 m, thus, paralyzing the development of the sector. In this area, NABRAWIND has developed an effective, reliable and with a competitive cost system that enables assembling any type of wind turbine tower, nacelle included, without any limitation in height and with complete independence from auxiliary cranes, thanks to a new lifting concept system based on hydraulic lifting mechanism which allows the system to operate from the ground. The overall objective of this project is the demonstration to ""stakeholders"" of the functionality and reliability of the final configuration of the new self-erection system for the construction of wind towers in a real operational environment with the aim to confirm that the design specifications and requirements of the application are fulfilled. "

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data