logo

Demonstration of Three Dynamic Grid-Side Technologies

Sector: Power Generation (CCGT) • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

The Demonstration of Three Dynamic Grid-Side Technologies project aims to roll out three novel technologies and intelligent control systems to understand and demonstrate their ability to increase the uptake of distributed energy resources (DER) at the neighbourhood level, safely and cost-effectively.These technologies improve the ability of network operators to monitor the low-voltage network, whi

Project Information FAQ

Project Information

5 Q
The project “Demonstration of Three Dynamic Grid-Side Technologies” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Demonstration of Three Dynamic Grid-Side Technologies project aims to roll out three novel technologies and intelligent control systems to understand and demonstrate their ability to increase the uptake of distributed energy resources (DER) at the neighbourhood level, safely and cost-effectively.These technologies improve the ability of network operators to monitor the low-voltage network, while the intelligent systems proactively manage grid power and voltage to increase DER penetration.Key resultsThis project successfully assessed the viability of three technologies to increase the DER hosting capacity of two sites within Jemena and AusNet Services’ low-voltage distribution networks in Victoria.The project confirmed that:dynamic and active management of electricity distribution networks can unlock additional capacity to host DERs.PSDs could enable 59% more DER hosting capacity at the AusNet Services network site, further increased to 88% with the adoption of PCD technology. By contrast, the future DER hosting capacity could only be increased by 29% without any introduced grid-side technologies.PSDs could enable 8% more DER hosting capacity at the Jemena network site, with the potential for a 36% increase with combined PCD and BESS controls. DER hosting capacity could be further increased from to 64% if the terminal voltage of the distribution transformer was optimised.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data