DEN Great Hall Terminal Upgrade
Sector: Government • Location: Denver, Colorado, United States of America
Source: Dodge USA
extensive upgrade to the main terminal at Denver International Airport which spans over 70000 square meters of floor space - Enhancing the security of the terminal by moving today s exposed TSA screening checkpoints from level 5 to level 6, creating a new and improved checkpoint experience - Increasing TSA throughput by an estimated 50-70 percent - Increasing capacity of the terminal to accommodat
- Status
- Prospective
- Sector
- Government, Consumer Products, Power Transmission, Airport, Commercial, Power Generation (CCGT), Raw Materials, Residential
- Location
- Denver, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about DEN Great Hall Terminal Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Sub Bidding, Construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | extensive upgrade to the main terminal at Denver International Airport which spans over 70000 square meters of floor space - Enhancing the security of the terminal by moving today s exposed TSA screening checkpoints from level 5 to level 6, creating a new and improved checkpoint experience - Increasing TSA throughput by an estimated 50-70 percent - Increasing capacity of the terminal to accommodate future growth - Better utilization of airline ticket spaces, increasing check-in counter space ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Denver |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Consumer Products, Power Transmission, Airport, Commercial, Power Generation (CCGT), Raw Materials, Residential |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
