logo
ProjectClosed

DEN Great Hall Terminal Upgrade

Closed · Colorado · Last reported Aug 2025

Source: Dodge

extensive upgrade to the main terminal at Denver International Airport which spans over 70000 square meters of floor space - Enhancing the security of the terminal by moving today s exposed TSA screening checkpoints from level 5 to level 6, creating a new and improved checkpoint experience - Increasing TSA throughput by an estimated 50-70 percent - Increasing capacity of the terminal to accommodat

Status
Closed
Sector
Airport, Consumer Products, Residential, Government, Power Transmission, Power Generation (CCGT), Commercial, Raw Materials
Location
Denver, Colorado, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about DEN Great Hall Terminal Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “DEN Great Hall Terminal Upgrade” is an infrastructure initiative in the Airport sector, located in Denver, Colorado, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

extensive upgrade to the main terminal at Denver International Airport which spans over 70000 square meters of floor space - Enhancing the security of the terminal by moving today s exposed TSA screening checkpoints from level 5 to level 6, creating a new and improved checkpoint experience - Increasing TSA throughput by an estimated 50-70 percent - Increasing capacity of the terminal to accommodate future growth - Better utilization of airline ticket spaces, increasing check-in counter space ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Denver

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Airport, Consumer Products, Residential, Government, Power Transmission, Power Generation (CCGT), Commercial, Raw Materials

Article published date

2025-08-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project