d’Envalira Tunnel
Sector: Tunnel • Location: Andorra
Source: FCC Construction
The d´Envalira tunnel is the highest in Europe and aorms a road connection between the north of the Andorra and the south of France. It consists of a single 2.87 kilometers tunnel with a single carriage way. This tunnel was excavated from the two mouths simultaneously using the New Method Austrian (NATM). Excavation methods varied from the use of explosives in areas of harder rock and machine exca
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The d´Envalira tunnel is the highest in Europe and aorms a road connection between the north of the Andorra and the south of France. It consists of a single 2.87 kilometers tunnel with a single carriage way. This tunnel was excavated from the two mouths simultaneously using the New Method Austrian (NATM). Excavation methods varied from the use of explosives in areas of harder rock and machine excavation in more suitable strata. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
