Deployment of the ERTMS – track side equipment on the second track Divača-Koper
Sector: Mass Transit • Location: Slovenia
Source: EU Funding & Tenders Portal
The Project “2TDK – ERTMS” is the part of the global project “Second track Divača-Koper” which comprises the construction of a new single-track railway link between the freight railway station Koper Tovorna, adjacent to the Port of Koper, and the station in Divača towards the city of Ljubljana. The new link will be 27,1 km long, with a 38 km in tunnels, including parallel service tunnels for the m
- Status
- Under Construction
- Sector
- Mass Transit, Tunnel, Rail
- Location
- Slovenia
- Updated
- 22 Jul 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about Deployment of the ERTMS – track side equipment on the second track Divača-Koper
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | ongoing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project “2TDK – ERTMS” is the part of the global project “Second track Divača-Koper” which comprises the construction of a new single-track railway link between the freight railway station Koper Tovorna, adjacent to the Port of Koper, and the station in Divača towards the city of Ljubljana. The new link will be 27,1 km long, with a 38 km in tunnels, including parallel service tunnels for the main part of the long tunnel sections. The global project scope aims at enhancing the capacity of the existing infrastructure to accommodate future growing demand for rail freight transport to/from the Port of Koper. The works covered by this application are related to the deployment of European Rail Traffic Management System – ERTMS (track side deployment). The goal of a Project “2TDK – ERTMS” is to ensure safe and reliable railway transport (provided safety, security, control, and traffic management). The Project “2TDK – ERTMS” consists of 3 (three) WP`s: - WP1: Project management, - WP2: ETCS and - WP3: Interlocking The components of the Project submitted to a CEF call 2024 “2TDK – ERMTS” are not self-sufficient. “2TDK – ERTMS” cannot function without other components (without global project). Also, global project cannot be completed if 2TDK – ERTMS” is not implemented. The technical parameters of the new railway track will be in compliance with the relevant standards for the rail Core Network. These include in particular: • Maximum speed up to 160 km/h (reduced to 80-100 km/h in some parts due to the topography); • GC clearance gauge; • Axle load of 22.5 t/axle (cat. D4); • Full electrification (3 kV DC system, with the possibility of later rearrangement to the 25 kV AC system); • ERTMS/ETCS Level 1. |
Location
Country | Slovenia |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Tunnel, Rail |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in Slovenia
- SLOVENIA RAILWAYS II
- BelotPay
- SLOVENIA RAILWAYS
- RAILWAY TRANSPORT SECTOR LOAN
- Zidani Most-Celje Railway Line Upgrade
- Reconstruction, Electrification, and Upgrading of Pragersko-Hodos Railway
- Revitalisation of the Route of Health and Friendship
- RECONSTRUCTION, ELECTRIFICATION AND UPGRADING OF THE RAILWAY LINE PRAGERSKO – HODOŠ (PRIORITY PROJECT NO. 6)
