Derby Public Safety Parking Lot REBID
Sector: Water Supply and Storage • Location: Montpelier, Vermont, United States of America
Source: Dodge
This project consists of, but is not limited to: The Department of Public Safety's Derby Vermont State Police barracks driveway and parking lot has experienced heaving during the winter months, causing cracking, settling, and damage to the vehicle loop that operates the secure gate. The work includes, but is not limited, to replacing the existing asphalt, install new loop detectors for automatic g
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Road, Electric Vehicles (EVs), Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Commercial, Automotive
- Location
- Montpelier, Vermont, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Derby Public Safety Parking Lot REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of, but is not limited to: The Department of Public Safety's Derby Vermont State Police barracks driveway and parking lot has experienced heaving during the winter months, causing cracking, settling, and damage to the vehicle loop that operates the secure gate. The work includes, but is not limited, to replacing the existing asphalt, install new loop detectors for automatic gate opener, and install new electrical conduit for future electric vehicle charging stations per ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Vermont |
City | Montpelier |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Electric Vehicles (EVs), Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Commercial, Automotive |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
