logo

Derby Reservoir Replacement Project

Sector: Commercial • Location: San Ramon, California, United States of America

Source: East Bay Municipal Utility District

Project
Active

As part of EBMUD’s infrastructure renewal program, the Derby Reservoir located on the access road by 2626 Derby Drive, San Ramon will be replaced. The existing 0.7-million gallon (MG) reservoir is oversized for the community it serves and has reached the end of its useful life. EBMUD will build a new smaller reservoir with a capacity of 0.3 million gallons. The replacement will reduce maintenance

Project Information FAQ

Project Information

4 Q
The project “Derby Reservoir Replacement Project” is an infrastructure initiative in the Commercial sector, located in San Ramon, California, United States of America. Taiyo aggregates data on it from East Bay Municipal Utility District.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

As part of EBMUD’s infrastructure renewal program, the Derby Reservoir located on the access road by 2626 Derby Drive, San Ramon will be replaced. The existing 0.7-million gallon (MG) reservoir is oversized for the community it serves and has reached the end of its useful life. EBMUD will build a new smaller reservoir with a capacity of 0.3 million gallons. The replacement will reduce maintenance costs and improve water quality. Workplan and schedule: Completion of the project calls for the demolish of the existing 0.7 MG Derby tank, and build and install a 0.3 MG welded-steel reservoir including foundation, aluminum dome roof, wind girder, access stairs, fall protection, valve vault, and related piping; abrasive blast and coat the interior and exterior. Additional improvements and upgrades will be done such as install solar panel, fencing, radio antennae, and other electrical improvements; repave reservoir site and access road. During the work period for completion of the reservoir, residents can expect to hear and see hauling trucks and equipment required for grading. Allowable work hours for this project are: • Monday through Friday from 7:30 a.m. to 6 p.m. The Derby Reservoir is part of a project that includes three additional reservoirs upgrade which includes, Acorn Reservoir, Scenic Reservoir, and Scenic East Reservoir. This project will start October 2020 and will be completed in the summer of 2022. Schedule is subject to change. There are no anticipated water service interruptions associated with this project. Contact information: Emergencies or after-hours, call EBMUD at 866-403-2683

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data