logo

Desarrollos Carreteros del Estado de Durango (Decarred)

Sector: Road • Location: Mexico

Source: World Bank Group

Project
Active

In May 2009, Desarrollos Carreteros del Estado de Durango (Decarred) signed a 20-year contract with the State of Durango to rebuild and upgrade 10 highways (327km of road) in the Liguna region of the State of Durango. The new roads were to connect to the 232km Durango-Mazatlan highway, which was to cross the country's western mountain range, the Sierra Madre Occidental.The project's total cost wa

Project Information FAQ

Project Information

4 Q
The project “Desarrollos Carreteros del Estado de Durango (Decarred)” is an infrastructure initiative in the Road sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In May 2009, Desarrollos Carreteros del Estado de Durango (Decarred) signed a 20-year contract with the State of Durango to rebuild and upgrade 10 highways (327km of road) in the Liguna region of the State of Durango. The new roads were to connect to the 232km Durango-Mazatlan highway, which was to cross the country's western mountain range, the Sierra Madre Occidental.The project's total cost was estimated at 1.5bn pesos (US$118mn). The project company was owned by Mexican firms Carreteras y Tecnologia en Concretos, S.A. de C.V and Carreteras y Tecnologia en Concretos, S.A. de C.V. The bidding variable was the Net Present Value of periodic payments totalling 3.4 billion pesos (US $269 million) over the 20 year period (starting with the contract signing in 2009). The project was tendered under the law for Proyectos de Inversion y de Prestacion de Servicios or (PIPS)system, similar to the federal PPS system. Under the PIPS,availability payments are made to the concessionaire in return for upgrading, operating and mainting the road. Tolls are usually not charged in these projects and in the case of Decarred, the sections were to remain toll-free. In December 2010,the Macquarie Mexican Infrastructure Fund (MMIF), operated by Australian investment bank Macquarie Group completed its acquisition of Desarrollos Carreteros del Estado de Durango (Decarred) from its previous operators, Rostec and Carreteras y Tecnología en Concretos, for approximately 1.544bn pesos (US$122 million). At the time of MMIF's acquisition, the toll-free roads were rebuilt and upgraded by cement manufacturer Cemex. The firm was to continue to perform maintenance work for the duration of the PPS contract, which expired in 2029.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data