Desert Blume Energy Storage Project
Under construction · Arizona · Last reported Jan 2025
Source: The Manila Times
Desert Blume is a 5-megawatt (MW), 10-hour-duration energy storage project developed by CMBlu Energy in collaboration with Salt River Project (SRP). It is the largest organic, non-lithium energy storage project under active development in the United States, designed to store excess energy during the day and return it to customers at night.
- Status
- Under Construction
- Sector
- Metal, Energy Storage, Residential, Commercial
- Location
- Florence, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- The Manila Times
ConstructChat
Ask ConstructChat about Desert Blume Energy Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Desert Blume is a 5-megawatt (MW), 10-hour-duration energy storage project developed by CMBlu Energy in collaboration with Salt River Project (SRP). It is the largest organic, non-lithium energy storage project under active development in the United States, designed to store excess energy during the day and return it to customers at night. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Arizona |
City | Florence |
Source
Source | The Manila Times |
URL |
More Details
Record type | Project |
Sector | Metal, Energy Storage, Residential, Commercial |
Article published date | 2025-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
