Design / Engineering of Future Capital Works at Wastewater Treatment Plant
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
In 2014 a Class Environmental Assessment (EA) on the Wastewater Treatment Plant was undertaken to identify a preferred alternative to address projected growth. It was identified that an increase in plant capacity, above the existing average day flow of 5,560 cubic metres per day was not warranted and that foreseeable needs of the Town could be addressed through optimizing the existing plant. Desig
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Design / Engineering of Future Capital Works at Wastewater Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In 2014 a Class Environmental Assessment (EA) on the Wastewater Treatment Plant was undertaken to identify a preferred alternative to address projected growth. It was identified that an increase in plant capacity, above the existing average day flow of 5,560 cubic metres per day was not warranted and that foreseeable needs of the Town could be addressed through optimizing the existing plant. Designing a new or modified grit removal system, associated odour control and a new or renovated administration, control and laboratory building would allow the Town to effectively plan for plant optimization identified in the EA. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
