logo

Design and Construction of Shields and Findlay Creek Stormwater Measures for Creek Rehabilitation

One of 10,000+ projects Taiyo tracks in Ontario.

Source: Infrastructure Canada

Project
Completed

The purpose of this project is to rehabilitate existing bank stabilization measures through the introduction of additional plantings and new bank stabilization measures. The bank stabilization measures proposed are the direct result of uncontrolled stormwater conveyance to the receiver (Sheilds Creek), as a result of development. This project will introduce “softer” measures (plantings, log cribbi

Status
Closed
Sector
Water Supply and Storage, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Design and Construction of Shields and Findlay Creek Stormwater Measures for Creek Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Design and Construction of Shields and Findlay Creek Stormwater Measures for Creek Rehabilitation” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The purpose of this project is to rehabilitate existing bank stabilization measures through the introduction of additional plantings and new bank stabilization measures. The bank stabilization measures proposed are the direct result of uncontrolled stormwater conveyance to the receiver (Sheilds Creek), as a result of development. This project will introduce “softer” measures (plantings, log cribbing, etc.) to stabilize the banks to achieve a stable creek corridor, while protecting property and reducing downstream sedimentation caused by bank undercutting.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government

Article published date

2026-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project