Design and Construction of the Bridlewood Neighborhood Localised Flood Protection Improvement Including New Manholes
Completed · Ontario
Source: Infrastructure Canada
Three large diameter sewers meet at a T-intersection (Milner Downs at Bridgestone). New manholes at this intersection are needed to improve the storm sewer hydraulics. The neighbourhood of Bridlewood has experienced basement flooding several times in the past 20 years. Through studies several pipe sections were identified as requiring upsizing to reduce the risk of flooding. On Palimino and Chicka
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Design and Construction of the Bridlewood Neighborhood Localised Flood Protection Improvement Including New Manholes
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Three large diameter sewers meet at a T-intersection (Milner Downs at Bridgestone). New manholes at this intersection are needed to improve the storm sewer hydraulics. The neighbourhood of Bridlewood has experienced basement flooding several times in the past 20 years. Through studies several pipe sections were identified as requiring upsizing to reduce the risk of flooding. On Palimino and Chickasaw streets 805 metres of 2100 mm storm trunk sewer will be upsized to 3000 mm. At Milner Downs and Bridgestone 20 metres of 1200 mm storm sewer will be reconfigured to minimize hydraulic losses to lower sewer surcharge. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-07-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
