Design and Construction Support Well 9
Closed · Washington · Last reported Mar 2025
Source: Dodge
Engineering services for Treats water from the skagit river and the city receives its treated water through 34 inch and 10 inch transmission mains Engineering services for Treats water from the skagit river and the city receives its treated water through 34 inch and 10 inch transmission mains
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Seaport, Waste Processing and Treatment, Government
- Location
- Oak Harbor, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Design and Construction Support Well 9
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Engineering services for Treats water from the skagit river and the city receives its treated water through 34 inch and 10 inch transmission mains Engineering services for Treats water from the skagit river and the city receives its treated water through 34 inch and 10 inch transmission mains |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Oak Harbor |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Seaport, Waste Processing and Treatment, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
