logo
ProjectArchived

Design Development and System Integration Design Studies for Coal FIRST Concepts

The status, timeline and source of this project. A free account opens every field.

Source: Grants.gov

Modification 000001 to issue the final FOA . Projects resulting from this Funding Opportunity Announcement will complete the following four tasks for a plant of one of the Coal FIRST power plant concepts listed below: design development, host site evaluation and Environmental Information Volume, an investment case analysis, and a system integration design study (i.e. front-end engineering design s

Status
Closed
Sector
Biomass, Hydrogen, Natural Gas, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial)
Location
United States of America
Updated
22 Jul 2026
Source
Grants.gov

ConstructChat

Ask ConstructChat about Design Development and System Integration Design Studies for Coal FIRST Concepts

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Design Development and System Integration Design Studies for Coal FIRST Concepts” is an infrastructure initiative in the Biomass sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Participants

Sponsoring Agency

Status

Original status

archived

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Modification 000001 to issue the final FOA . Projects resulting from this Funding Opportunity Announcement will complete the following four tasks for a plant of one of the Coal FIRST power plant concepts listed below: design development, host site evaluation and Environmental Information Volume, an investment case analysis, and a system integration design study (i.e. front-end engineering design study: Flexible Ultra Supercritical (USC) Coal-Fired Power Plant (AOI 1) Pressurized Fluidized Bed Combustor with Supercritical Steam Cycle Power Plant (AOI 2) Hybrid Natural Gas Turbine USC Coal Boiler Power Plant (AOI 3) Flexible Gasification of Coal and Biomass to Generate Electric Power and a Carbon-Free Hydrogen Co-Product (AOI 4) The projects resulting from this FOA could be based on retrofit brownfield and,or greenfield applications of Coal FIRST systems.

Location

Country

United States of America (USA)

Source

Source reliability

High

Source

Grants.gov

URL

More Details

Record type

Project

Sector

Biomass, Hydrogen, Natural Gas, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial)

Article published date

2023-06-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project