Design needed for the separation of the drinking water and the sewer line as the water line is crossing the sewer line. (phase 1 of 2)
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
During a study in 2016, it was found that a drinking water line was crossing through the sanitary sewer system. The water line must be separated from the sewer line, which requires an engineered redesign to ensure applicable standards are met and hydraulic integrity of the distribution system is not adversely affected. (Phase 1 of 2, Phase 2 will be the physical separation of the watermain from th
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | During a study in 2016, it was found that a drinking water line was crossing through the sanitary sewer system. The water line must be separated from the sewer line, which requires an engineered redesign to ensure applicable standards are met and hydraulic integrity of the distribution system is not adversely affected. (Phase 1 of 2, Phase 2 will be the physical separation of the watermain from the sewer main and is further described in next project.) Objective: To create a design to separate the water and sewage piping which presently intersect as identified in the Closed-circuit television inspections. This design must consider the required separation required between sanitary sewers and municipal water system pipe. Scope: Procure Engineering Consultant. Consultant to design an alternate watermain route that meets requirements and can be used to perform or tender construction in Phase 2. Output: Engineered drawing that clearly describe details required by constructors, including but not limited to material, required depths of each utility, backfill required, surfacing required, and any details of use to the contractor. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |