Design of Advanced Uranium Fuels Facility
Planned · England · Last reported May 2025
Source: Construction Index
Costain has been appointed to undertake the front-end engineering design for Urenco’s high assay low enriched uranium (HALEU) advanced fuels facility at the Capenhurst site in Cheshire. This facility will produce specialist fuel for the next generation of nuclear reactors, including advanced modular reactors (AMRs) and small modular reactors (SMRs).
- Status
- Prospective
- Sector
- Nuclear
- Location
- Cheshire, England, United Kingdom
- Updated
- 22 Jul 2026
- Source
- Construction Index
ConstructChat
Ask ConstructChat about Design of Advanced Uranium Fuels Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Costain has been appointed to undertake the front-end engineering design for Urenco’s high assay low enriched uranium (HALEU) advanced fuels facility at the Capenhurst site in Cheshire. This facility will produce specialist fuel for the next generation of nuclear reactors, including advanced modular reactors (AMRs) and small modular reactors (SMRs). |
Location
Country | United Kingdom (UK) |
State | England |
City | Cheshire |
Source
Source | Construction Index |
URL |
More Details
Record type | Project |
Sector | Nuclear |
Article published date | 2025-05-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
