logo

Design of Integral Urban Development Projects for Brazilian Municipalities

Sector: Government • Location: Brazil

Source: Inter-American Development Bank (IADB)

Project
Implementation

This Technical Cooperation (TC) aims at supporting Brazilian municipalities to design integral urban development projects to promote urban economic reactivation and socio-economic development. The specific objectives are (i) to set up a joint strategy with the Brazilian National Development Bank (BNDES) to design and implement financial mechanisms for integral urban development projects, and (ii)

Project Information FAQ

Project Information

5 Q
The project “Design of Integral Urban Development Projects for Brazilian Municipalities” is an infrastructure initiative in the Government sector, located in Brazil. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

implementation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This Technical Cooperation (TC) aims at supporting Brazilian municipalities to design integral urban development projects to promote urban economic reactivation and socio-economic development. The specific objectives are (i) to set up a joint strategy with the Brazilian National Development Bank (BNDES) to design and implement financial mechanisms for integral urban development projects, and (ii) provide technical assistance to medium and large-sized municipalities during the preparation of proposals for urban development projects, including mobilizing expertise and resources from the private sector; and (iii) endure that those proposals contemplate the requirements and the necessary studies aligned with IDB strategies.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data