Design Upgrades for Sewage Pump Station #1 located at 524 Taylor Street, Wiarton
Completed · Ontario
Source: Infrastructure Canada
The Taylor St. Sewage Pumping Station (SPS 1) occasionally bypasses raw sewage to Colpoys Bay (Georgian Bay) during peak flow events as all sewage for the entire Town routes through this pump station. Preliminary assessment work has identified provision of equalization storage tanks as a potential means to prevent or reduce the occurrence of bypassing. The proposed project will include a Class Env
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Design Upgrades for Sewage Pump Station #1 located at 524 Taylor Street, Wiarton
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Taylor St. Sewage Pumping Station (SPS 1) occasionally bypasses raw sewage to Colpoys Bay (Georgian Bay) during peak flow events as all sewage for the entire Town routes through this pump station. Preliminary assessment work has identified provision of equalization storage tanks as a potential means to prevent or reduce the occurrence of bypassing. The proposed project will include a Class Environmental Assessment (Schedule B) to confirm the preferred alternative, as well as project final design and approvals (e.g. Environmental Compliance Approval), and contract preparation in anticipation of construction of the works. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
