logo

Detailed design and construction of a new in ground water reservoir and a pump station to meet the capacity requirements of existing and future planned growth

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

Project
Completed

Detailed design and construction of a new in ground water reservoir and a pump station. The 2012 Town Wide Water and Wastewater Master Servicing Plan identified a servicing deficiency with Churchill’s current reservoir storage capacity. The already completed environmental assessment estimated the size of the new reservoir at 1000 cubic meter and the pump station having a capacity of 544 cubic mete

Status
Closed
Sector
Water Supply and Storage, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Detailed design and construction of a new in ground water reservoir and a pump station to meet the capacity requirements of existing and future planned growth

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Detailed design and construction of a new in ground water reservoir and a pump station to meet the capacity requirements of existing and future planned growth” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Detailed design and construction of a new in ground water reservoir and a pump station. The 2012 Town Wide Water and Wastewater Master Servicing Plan identified a servicing deficiency with Churchill’s current reservoir storage capacity. The already completed environmental assessment estimated the size of the new reservoir at 1000 cubic meter and the pump station having a capacity of 544 cubic meters per day. The proposed pump station would feed the existing water distribution system.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project