Detailed Wastewater System Assessment and Identification of Alternatives to Meet Guidelines and Future Community Environmental and Health and Safety Needs
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
This project will include the detailed assessment of the communal wastewater collection system at Grassy Narrows First Nation. The current system consists of a network of gravity sewers, five (5) sewage pumping stations, and the connecting forcemain which feeds a Rotating Biological Contactor (RBC) treatment plant which discharges to a dual cell sewage lagoon, as well as. This system network curre
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Detailed Wastewater System Assessment and Identification of Alternatives to Meet Guidelines and Future Community Environmental and Health and Safety Needs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will include the detailed assessment of the communal wastewater collection system at Grassy Narrows First Nation. The current system consists of a network of gravity sewers, five (5) sewage pumping stations, and the connecting forcemain which feeds a Rotating Biological Contactor (RBC) treatment plant which discharges to a dual cell sewage lagoon, as well as. This system network currently services approximately 80% of the community with the remaining population being reliant on individual septic systems. The wastewater plant was designed over 25 years ago to treat wastewater flows up to the year 2011 and is therefore beyond its intended lifecycle and has exceeded its volume and treatment capacity. The lack of capacity to not only meet current, let alone future community needs, is presenting a considerable risk to the health and safety of residents and the environment. It is therefore required that a detailed assessment be completed to identify all existing deficiencies as well as provide upgrade alternatives and future recommendations that will be essential to providing adequate wastewater services to the community. This assessment will also identify possible solutions to removing any immediate and significant health and safety and environmental risks associated with the system being at capacity and consequent negative impacts on the receiving environment. This will ultimately benefit the receiving environment off reserve. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
