Detroit Microgrid Flexibility Project
Sector: Energy Storage • Location: Detroit, Michigan, United States
Source: EV Infrastructure News
Delta Electronics has installed a microgrid system at its Detroit, Michigan facility in partnership with Michigan utility DTE Energy. The system tests interactive grid power management technologies including solar generation, EV chargers, and energy storage. It features 425kW solar generation, eight level 2 EV chargers, a 400kW DC fast EV charger, 2.8MWh battery energy storage, a 3MW power conditi
- Status
- Closed
- Sector
- Energy Storage, Power Generation (CCGT), Solar, Electric Vehicles (EVs), Power Transmission, Commercial, Data Center, Automotive
- Location
- Detroit, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- EV Infrastructure News
ConstructChat
Ask ConstructChat about Detroit Microgrid Flexibility Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Delta Electronics has installed a microgrid system at its Detroit, Michigan facility in partnership with Michigan utility DTE Energy. The system tests interactive grid power management technologies including solar generation, EV chargers, and energy storage. It features 425kW solar generation, eight level 2 EV chargers, a 400kW DC fast EV charger, 2.8MWh battery energy storage, a 3MW power conditioning system, and a solid-state transformer. The project aims to optimize data center and commercial energy use, reduce peak demand, and increase grid resilience. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Michigan |
City | Detroit |
Source
Source | EV Infrastructure News |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Solar, Electric Vehicles (EVs), Power Transmission, Commercial, Data Center, Automotive |
Article published date | 2026-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
