logo
ProjectNot Applicable

DEVADARI IRON ORE MINING PROJECT

The status, timeline and source of this project. A free account opens every field.

Source: India Investment Grid (IIG)

Information Kudremukh Iron Ore Company Limited [KIOCL] has come up with DEVADARI IRON ORE MINING PROJECT with a ticket size of 882.46 INR Crores. This project in Mine sub-sector involves The current status of the project is Not Applicable Economic/Social Impact of the Project Devadari Iron Ore Mine Project is a Greenfield project having an initial capacity of 2.0 MTPA of Iron Ore -ROM and 500 T

Status
Under Construction
Sector
Metal, Steel, Manufacturing (Industrial), Road, Government
Location
Sandur, Karnataka, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about DEVADARI IRON ORE MINING PROJECT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “DEVADARI IRON ORE MINING PROJECT” is an infrastructure initiative in the Metal sector, located in Sandur, Karnataka, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

not applicable

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information Kudremukh Iron Ore Company Limited [KIOCL] has come up with DEVADARI IRON ORE MINING PROJECT with a ticket size of 882.46 INR Crores. This project in Mine sub-sector involves The current status of the project is Not Applicable Economic/Social Impact of the Project Devadari Iron Ore Mine Project is a Greenfield project having an initial capacity of 2.0 MTPA of Iron Ore -ROM and 500 TPA of Manganese Ore, Production involving excavation of Iron ore & Manganese ore by mechanized opencast method with drilling and blasting for supply of Iron ore fines-concentrate to pellet plant and Iron ore lumps to Blast furnace unit at Mangalore. It is also proposed to set up 2 MTPA Beneficiation plant including Crushing, Screening, Conveying within mining lease area. The mined ore is proposed to be beneficiated to produce 1.2 MTPA of Iron ore concentrate & 0.4 MTPA Calibrated Lump Ore -CLO. The filtered Iron ore concentrate 1.2 MTPA and CLO -0.4 MTPA together with Manganese ore 500 TPA is proposed to be used in KIOCL Pellet Plant, Blast Furnace at Mangalore

Original sector

Metals & Mining

Procurement method

Budget

Location

Country

India

State

Karnataka

City

Sandur

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Metal, Steel, Manufacturing (Industrial), Road, Government

Article published date

2025-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project