DeValera Drive Reconstruction
Pre-design · Wisconsin · Last reported Dec 2024
Source: Dodge USA
Replacement of DeValera Drive from Biarritz Boulevard to east end (634 feet). This will replace the failing sealcoat street from Biarritz Boulevard to the east end. It will replace the underground utilities (water, sanitary sewer and storm sewer) and install conduit for future fiber optics.
- Status
- Prospective
- Sector
- Water Supply and Storage, Broadband, Waste Processing and Treatment, Road, Power Transmission, Government, Telecommunications, Commercial, Power Generation (CCGT)
- Location
- Platteville, Wisconsin, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about DeValera Drive Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replacement of DeValera Drive from Biarritz Boulevard to east end (634 feet). This will replace the failing sealcoat street from Biarritz Boulevard to the east end. It will replace the underground utilities (water, sanitary sewer and storm sewer) and install conduit for future fiber optics. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Platteville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Broadband, Waste Processing and Treatment, Road, Power Transmission, Government, Telecommunications, Commercial, Power Generation (CCGT) |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
