Developer for New Aloha Stadium
Closed · Hawaii · Last reported Apr 2024
Source: Dodge USA
Phase 1 The scope of Phase 1 of the NASED Program comprises: (a) The "Phase 1A Project": under a P3 model, the design, construction, financing 1 and maintenance (as relevant) of a new 35,000 seat (indicative) stadium (the "New Aloha Stadium") and a prescribed minimum surrounding area with supporting infrastructure (e.g. roadways, parking, public spaces and requisite changes to utilities) for Phase
- Status
- Closed
- Sector
- Car parking, Power Transmission, Stadium, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Honolulu, Hawaii, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Developer for New Aloha Stadium
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 1 The scope of Phase 1 of the NASED Program comprises: (a) The "Phase 1A Project": under a P3 model, the design, construction, financing 1 and maintenance (as relevant) of a new 35,000 seat (indicative) stadium (the "New Aloha Stadium") and a prescribed minimum surrounding area with supporting infrastructure (e.g. roadways, parking, public spaces and requisite changes to utilities) for Phase 1 and connections to the HART Station, including the demolition of the current Aloha Stadium and... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Hawaii |
City | Honolulu |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Stadium, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
