Developing Pakistan's Hydroelectric Resources With The Jabban Power Plant

Sector: Power Generation (CCGT) • Location: France

Source: Proparco Groupe AFD (Agence Française de Développement)

Project
Achevé

Jabban is a run-of-the-river power station located on the Swat Canal, using a vertical drop of 76 meters for a nominal flow of 34 m3/s. It has been out of order since November 2006, following a fire. WAPDA used the fire as an opportunity to completely review the power plant's equipment, with the modification and construction of the necessary civil engineering infrastructure. The project included:D

Project Information FAQ

Project Information

4 Q
The project “Developing Pakistan's Hydroelectric Resources With The Jabban Power Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in France. Taiyo aggregates data on it from Proparco Groupe AFD (Agence Française de Développement).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

achevé

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Jabban is a run-of-the-river power station located on the Swat Canal, using a vertical drop of 76 meters for a nominal flow of 34 m3/s. It has been out of order since November 2006, following a fire. WAPDA used the fire as an opportunity to completely review the power plant's equipment, with the modification and construction of the necessary civil engineering infrastructure. The project included:Dismantling existing equipment and the demolition of some civil engineering infrastructureThe rehabilitation of infrastructure as required (water intake), the dismantling of three of the five penstocks and their replacement with two new onesThe supply, installation and commissioning of electromechanical equipment and a 132 kV substation, including the inherent civil worksThe completion of a 132 kV line over 3 kilometres to connect to the national grid.Future production was estimated at 126 GWh/year.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data