logo

Developing the PTO of the first MW-level Oscillating Wave Surge Converter

Sector: Energy Storage • Location: Finland, Portugal, Norway, Germany

Source: EU Funding & Tenders Portal

Project
Ended

The MegaRoller project will develop and demonstrate a Power Take-Off (PTO) for wave energy converters. The PTO is developed in conjunction with oscillating wave surge converters (OWSCs), a class of wave power technology that uses bottom-hinged plates oscillating in pitch following the surge movement of the water particles in the nearshore zone (10m-25m water depth). The development and demonstrati

Project Information FAQ

Project Information

3 Q
The project “Developing the PTO of the first MW-level Oscillating Wave Surge Converter” is an infrastructure initiative in the Energy Storage sector, located in Finland, Portugal, Norway, Germany. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The MegaRoller project will develop and demonstrate a Power Take-Off (PTO) for wave energy converters. The PTO is developed in conjunction with oscillating wave surge converters (OWSCs), a class of wave power technology that uses bottom-hinged plates oscillating in pitch following the surge movement of the water particles in the nearshore zone (10m-25m water depth). The development and demonstration of the PTO for a 1MW OWSC device is based on multiple hardware innovations (modular design, twin drive trains, intelligent cylinders, standardized central power unit and novel accumulator arrangement) and software innovations (wave-by-wave damping control, advanced efficiency control, energy storage control, power smoothing and prediction). The project will therefore generate extensive know-how in the area of PTO design and PTO control systems, with the aim to decrease the LCOE of next generation OWSC devices below €150/MWh. The methodologies used in the project (such as wave-by-wave damping control and prediction, standardized power units) will be applicable to many other Wave Energy Converter types and generate new standards (algorithms) for PTO control, thus benefiting the broader ocean energy community. The full-scale PTO will be validated in a PTO test rig available at AW-Energy in Finland, a facility allowing the consortium to create power matrices for the wave conditions of different sites, fine-tune the PTO control algorithms, certify the operation of the PTO and ensure that the produced electricity conforms to the various grid codes of different market areas. In the short term, the developments will increase performance (power conversion from 70 to 88%), increase reliability (lifetime x2, service intervals x2, O&M costs -75%), decrease costs (power density x2.8) and improve power quality. In the long term, a 40,000 MW roll-out of MegaRoller power plants can generate 400,000 jobs by 2050 and 110M tons / year CO2 savings in Europe only.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data