logo

Development of a robotic maintenance system for wind turbine blades

Sector: Wind • Location: Portugal, Denmark, Spain, Latvia

Source: EU Funding & Tenders Portal

Project
Ongoing

The wind energy sector continues growing rapidly even under the pandemic, as an estimated 93GW wind capacity was installed in 2020 globally. After installation, wind turbines are expected to run around 20-25years, during which O&M (operation and maintenance) becomes crucial in maximising the economic and environmental benefits of wind assets. This project aims to develop a complete solution for ro

Status
Under Construction
Sector
Wind
Location
Portugal
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Development of a robotic maintenance system for wind turbine blades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Development of a robotic maintenance system for wind turbine blades” is an infrastructure initiative in the Wind sector, located in Portugal, Denmark, Spain, Latvia. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The wind energy sector continues growing rapidly even under the pandemic, as an estimated 93GW wind capacity was installed in 2020 globally. After installation, wind turbines are expected to run around 20-25years, during which O&M (operation and maintenance) becomes crucial in maximising the economic and environmental benefits of wind assets. This project aims to develop a complete solution for robotic based inspection and repair of wind turbine blades (WTBs), both onshore and offshore. Firstly, we will integrate thermography and shearography with laser heating, so that advanced lock-in techniques will be achieved for in-situ inspection of both surface and subsurface defects within WTBs. (Current techniques including drone-based are limited to surface defects only). Secondly, a compact and efficient robotic deployment system will be developed which will hold the inspection unit and a robotic repair arm. The robotic system will be operated by engineers working on ground (for onshore wind farms) or on a vessel (for offshore wind farms). When defects are detected and deemed reparable, the repair arm of the whole system will be activated to rapidly repair the faulty area of composite components by resistance welding for joining and/or disassembly. Comparing to the traditional adhesively bonding for repair, the proposed resistance welding with optimised processing would significantly reduce the curing cycles/time with much fewer preparation for surface treatment steps while it will be more easily designed to integrate with robotic arm. The whole system will be operated remotely by engineers working on ground or on a vessel without risking their lives working in the sky on WTBs. Field trials on wind towers will be conducted to validate the system.

Location

Country

Portugal

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Wind

Article published date

2025-10-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project