Development of a Toolkit Guide on Separated Bicycle Lanes on Higher Speed
Sector: Road • Location: Washington, United States of America (USA)
Source: Federal Highway Administration (FHWA)
The contractor shall synthesize existing research on the potential benefits and obstacles, existing design and planning guidance, and identify separated bike lanes in the U.S. that have been implemented on higher speed (40+ mph) roadways. Using information from the case studies, the contractor shall develop materials that include information references, agency policies, processes, and other resour
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | proposed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The contractor shall synthesize existing research on the potential benefits and obstacles, existing design and planning guidance, and identify separated bike lanes in the U.S. that have been implemented on higher speed (40+ mph) roadways. Using information from the case studies, the contractor shall develop materials that include information references, agency policies, processes, and other resources and procedures that can help agencies overcome obstacles to implementing separated bike lanes on higher speed roads. The toolkit guide should include: • Research-based evidence about the potential benefits of separated bike lanes on higher speed roads, • Examples of policies and design guides encouraging their uses, • Discussion of known obstacles to implementation, such as maintenance cost concerns, • Discussion of considerations for full reconstruction versus retrofit within existing curb lines, • Example cross-sections for common separated bike lane design scenarios, • Case study examples. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
