logo

Development of Basoda-Gurod-Sironj Road MP-MDR-29-11 and Sultania-Pipalkheda-Sallaiya Road MP-MDR-29-16 to two lane in the length of 59.330 km in the State of Madhya Pradesh on Hybrid Annuity Mode.

Sector: Road • Location: Vidisha, Madhya Pradesh, India

Source: India Investment Grid (IIG)

Project
Closed

Information Madhya Pradesh Road Development Corporation has come up with Development of Basoda-Gurod-Sironj Road MP-MDR-29-11 and Sultania-Pipalkheda-Sallaiya Road MP-MDR-29-16 to two lane in the length of 59.330 km in the State of Madhya Pradesh on Hybrid Annuity Mode. with a ticket size of 72.73 INR Crores. This project in Roads & Bridges sub-sector involves The current status of the project

Project Information FAQ

Project Information

5 Q
The project “Development of Basoda-Gurod-Sironj Road MP-MDR-29-11 and Sultania-Pipalkheda-Sallaiya Road MP-MDR-29-16 to two lane in the length of 59.330 km in the State of Madhya Pradesh on Hybrid Annuity Mode.” is an infrastructure initiative in the Road sector, located in Vidisha, Madhya Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Madhya Pradesh Road Development Corporation has come up with Development of Basoda-Gurod-Sironj Road MP-MDR-29-11 and Sultania-Pipalkheda-Sallaiya Road MP-MDR-29-16 to two lane in the length of 59.330 km in the State of Madhya Pradesh on Hybrid Annuity Mode. with a ticket size of 72.73 INR Crores. This project in Roads & Bridges sub-sector involves The current status of the project is Concessionaire Appointment and is being developed through the PPP route. Economic/Social Impact of the Project The Project Road Sultania Pipalkheda Sallaiya starts from a Y junction on Vidisha Nasaratgarh road at Sultania & terminates at T Junction on Vidisha Berasia Road at Saliya. The project road acts as a Connectivity Road Between SH 23 and SH 19 road. The proposed road section is part of the New MDR network on Madhya Pradesh. The existing road sections are mostly single lane & intermediate lane roads with carriageway width vary from 3.75m to 5.50m with earthen shoulders.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data