Development of Combined Cycle Using Solar Reformed Gas

Sector: Commercial • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

This Development of Combined Cycle Using Solar Reformed Gas project aimed to demonstrate the technical and economic feasibility of a combined cycle power plant fuelled with natural gas that has been ‘upgraded’ using solar thermal energy.Key resultsThe commercial assessment performed by GE Australia has highlighted a number of barriers to taking the project to the next stage. The market for power g

Project Information FAQ

Project Information

5 Q
The project “Development of Combined Cycle Using Solar Reformed Gas” is an infrastructure initiative in the Commercial sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This Development of Combined Cycle Using Solar Reformed Gas project aimed to demonstrate the technical and economic feasibility of a combined cycle power plant fuelled with natural gas that has been ‘upgraded’ using solar thermal energy.Key resultsThe commercial assessment performed by GE Australia has highlighted a number of barriers to taking the project to the next stage. The market for power generation has not developed as predicted when the project was first proposed. The hybrid nature of the fuel and solar has operation limits in the turbine combustor (Wobbe index and NOx Emissions) resulting in minimal savings in CO2 emissions. There are also factors associated with introduction of new technology and the risk burden they present to a mining customer.The assessment by GE Australia highlighted the following barriers:Proven technology with long demonstration of operation has typically been used to meet requirements, as it offers security and reliability above all else.There is no reason to alter the current power generation mix including augmentation or improvement and especially not using ‘speculative’ technology.For the most part, except for utilities, customers core business is not power generation.Increasing the complexity of power generation assets is highly unappealing to potential partners.The addition of more moving parts, including changing gas supplies twice per day, increases risk of failure in the system.The project economics presented a case where the Levelized Cost of Energy (LCOE) remains effectively unchanged, despite the addition of a solar field and reactor system, capital cost increases were offset by improvements in thermal efficiency. The assessment highlights that the risks involved in developing such a system out-way the benefits at this point in time.The project has demonstrated that hybridisation of power generation with a solar thermochemical process is achievable, with the technical challenges addressed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data