Development of Mega Water Supply System from Getalsud Dam to Hatia Dam, Ranchi, Jharkhand
Sector: Hydro • Location: Ranchi, Jharkhand, India
Source: India Investment Grid (IIG)
Information Drinking Water & Sanitation Department, Government of Jharkhand has come up with Development of Mega Water Supply System from Getalsud Dam to Hatia Dam, Ranchi, Jharkhand with a ticket size of 473.93 INR Crores. This project in Water Treatment Plants sub-sector involves The current status of the project is Tender Publish and is being developed through the EPC route. Economic/Social Im
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | tender publish |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Drinking Water & Sanitation Department, Government of Jharkhand has come up with Development of Mega Water Supply System from Getalsud Dam to Hatia Dam, Ranchi, Jharkhand with a ticket size of 473.93 INR Crores. This project in Water Treatment Plants sub-sector involves The current status of the project is Tender Publish and is being developed through the EPC route. Economic/Social Impact of the Project The Scope of works included detailed survey, designing and drawing, Construction of R.C.C. Intake Well cum Pump House, R.C.C. Gang Way, Construction of, 72.50 MLD capacity of Water Treatment Plant, Staff Quarter 2 Nos. , Compound wall, Supplying and laying Raw Clear Water rising main and Distribution Network, RCC Riser, House Connection, Road Crossing, Railway Crossing, 4 Nos. Pipe Carrying Bridge, Supplying and Installation of VT and Centrifugal pump motor, and Five years operation & maintenance with allied works etc. all complete job for Mega Rural Water Supply Scheme along ring road From Getalsud Dam to Hatia Dam Including Institutional Demand |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
