logo

Development of Power Distribution Infrastructure at East Jaintia Hills, Meghalaya

Sector: Manufacturing (Industrial) • Location: East Jaintia Hills, Meghalaya, India

Source: India Investment Grid (IIG)

Project
Closed

Information Meghalaya Energy Corporation Limited has come up with Development of Power Distribution Infrastructure at East Jaintia Hills, Meghalaya with a ticket size of 32.54 INR Crores. This project in Electricity Distribution sub-sector involves The current status of the project is Tender Publish and is being developed through the EPC route. Economic/Social Impact of the Project Meghalaya Ener

Project Information FAQ

Project Information

5 Q
The project “Development of Power Distribution Infrastructure at East Jaintia Hills, Meghalaya” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in East Jaintia Hills, Meghalaya, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Meghalaya Energy Corporation Limited has come up with Development of Power Distribution Infrastructure at East Jaintia Hills, Meghalaya with a ticket size of 32.54 INR Crores. This project in Electricity Distribution sub-sector involves The current status of the project is Tender Publish and is being developed through the EPC route. Economic/Social Impact of the Project Meghalaya Energy Corporation Limited envisage for the Development of Distribution Infrastructure at East Jaintia Hills of Meghalaya, with a total cost INR 32.54 Cr.The work is to be executed on turnkey basis, the scope of which includes survey, network design, supply, manufactures quality assurance, testing [where specified required], transportation, storage, erection, including all civil structural works, site testing, commissioning of all items & materials including all associated activities though not exclusively specified herein and are required for the completion and satisfactory performance of the entire works as intended.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data