Development of the 118.4MW Hydro Electricity Plant and Associated Transmission Facilities in Zambia

Sector: Hydro • Location: Mkushi, Zambia

Source: United Nations Industrial Development Organization (UNIDO)

Project

Mulembo Lelya Hydro Electric Power Limited (MLHEPL) is a limited company by shares and owned by AFI Zambia Ltd, Mchimadzi Hydro Electric Ltd, Engineer Ezekiel Kasaro and Dr. Alick Mwanza. This project involves the development of the 118.4MW MLHEP Station which is designed to exploit the energy potential of the Mulembo River in Mkushi and Luano Districts and Lelya River border of Nyimba and Serenje

Project Information FAQ

Project Information

5 Q
The project “Development of the 118.4MW Hydro Electricity Plant and Associated Transmission Facilities in Zambia” is an infrastructure initiative in the Hydro sector, located in Mkushi, Zambia. Taiyo aggregates data on it from United Nations Industrial Development Organization (UNIDO).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Mulembo Lelya Hydro Electric Power Limited (MLHEPL) is a limited company by shares and owned by AFI Zambia Ltd, Mchimadzi Hydro Electric Ltd, Engineer Ezekiel Kasaro and Dr. Alick Mwanza. This project involves the development of the 118.4MW MLHEP Station which is designed to exploit the energy potential of the Mulembo River in Mkushi and Luano Districts and Lelya River border of Nyimba and Serenje Districts. The gross head of the two rivers is approximately 450m and the proposed layout will include a dam, a water transfer scheme from Lelya to Mulembo River leading to the main hydropower plant. A small hydropower plant will be built at dam toe which will exploit the head created by the reservoir with an installed capacity of 7MW. The dam provides significant plant flexibility and includes possible peak power production, which could be further enhanced by integration of the hydro power with wind and solar energy. The duration of the construction has been estimated on the basis of a typical specialized contractor’s standard timeline to take 42months. The Project economics show competitive tariffs to off-takers and IRR to investors averaging 16%, in US Dollar terms. The Project is anticipated to generate up to 451 gigawatt-hour of electrical energy per year which will be injected into the 330KV grid at Pensulo Sub-Station through a 120km, 220 kV transmission line and the power will be taken by any potential bankable off-taker. The target market for the power is the Zambian market and the Southern Africa Power Pool (SAPP). All the critical studies have been completed and the 3 major milestones to get the Project to financial close are the EPC contract, PPA and signature of the IA. The project cost including the transmission line to evacuate the power to the Pensulo sub-station is estimated at US$285 million. The project is open to FDI through a minority or majority stake, or through a JV or PPP. This project is situated on the border of the Central and Eastern Province.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data